Now that the stairs are installed, the carpenters were able to frame-in below them, adding the walls (including under the stairs, at bottom left) and the doorframe to the basement. Basement stairs are being built now and will be installed in a couple of weeks. Also note the plywood wall in the basement stairwell - this is the backside of an MDO sheet whose other, finished side creates the back of the kitchen appliance recess.