Over the weekend I installed and taped some initial sheetrock in the room above the garage. My goal is to finish the 2 walls that will have baseboard radiator heaters so that the plumber can install those radiators when they finish plumbing the rest of the house. This wall's radiator will run between the 2 pipe stubs that are each about 2' in from the side walls. Once the taping is done, I need to prime and paint this wall.