Here's the hydro-seeding machine. They dump a couple of large bags of seed/cellulose mix in the top, drive it down to the lake and pump in 100 gallons of water, then mix well for about 10 minutes (there's a 10 HP "lawnmower" engine on the back). Once mixed, it's pumped out the hose you see running on the ground.