Here's the ceiling with the beadboard and light all installed (It's less yellow in person). Below the windows you can see he flooring stacked on sawhorses - that's the next project. The floor is covered by a rubber membrane to prevent water from leaking onto the downstairs ceiling (this is technically an exterior room).