Friday, October 20th, 2000



The deck for the back porch is framed.

Here's the view of the back porch from the dining room.

They finished shingling the front porch roof and have begun shingling the 2nd story.

Here's a view of the front porch from the other end, a side I don't think I've shown before. The electric meter will be located to the right of the corner of the house.

The mason erected his scaffolding for building the chimney. I don't think I'd feel comfortable on top of this!